Do-it-yourself game plans · Question 12

Stress-test the slowest stage, including review and evidence resolution.

How do you prepare for catastrophe surges and system failures?

Scopeframe research deskSection 02Page 13 of 17Updated 20 October 2026

Increasing draft-estimate output is not useful if accepted-file completion cannot keep pace.

Build a proposed Catastrophe Production Capacity Stress Test using:

  • Normal, double, triple and fivefold assignment scenarios.
  • Changes in evidence completeness and loss complexity.
  • Producer and reviewer availability.
  • Training time for temporary staff.
  • Rework and exception workloads.
  • Platform or inspection-partner outages.
  • Existing backlog and deadline exposure.

Use a transparent queue equation:

Closing backlog = opening backlog + new assignments − completed assignments − separately recorded withdrawals or transfers.

Hypothetical example: 120 eligible files arrive daily and only 90 become usable. The queue grows by 30 a day, or 300 over ten working days. If arrivals later fall to 60 and usable-file capacity reaches 100, the 300-file excess needs 7.5 working days to clear, assuming unchanged complexity and no additional disruption.

What should the surge runbook specify?

  • Activation thresholds based on backlog age and completion capacity.
  • Named decision-maker and daily operating review.
  • Pre-qualified overflow personnel and permitted jurisdictions.
  • Capacity reserved for acceptance review and technical escalation.
  • Prioritisation approved by claims and compliance.
  • No silent relaxation of evidence or acceptance requirements.
  • Approved communication ownership.
  • Manual fallback, restoration priorities and transfer reconciliation.
  • Rules for returning overflow work to the normal operation.

Exit gate: run a tabletop and a practical transfer/recovery test before describing the operation as surge-ready.